Water Quality and Animal Feeding Operations in Arizona: A Producer's Notebook

Worksheet #1:  BMP Plan Responsibility (Excel version, 10KB)

 

If completed, the BMP worksheets can be used to complete IV.B.1.c.iv - xiii, except v. 
To complete the BMP plan, producers can use worksheets 1- 6 and include the following two items:
  1. a map that shows drainage patterns, surface water bodies, and manure containment structures
  2. the animal waste management system engineering plan OR a description of how the minimum standards (part IV.B.2.) will be addressed.
Person(s) responsible for the BMP plan (see part IV. B. 1. c. iv. of Arizona General NPDES permit)
1.  Is the owner responsible for the following
     Developing the BMP plan? YES NO* 
     Implementing the BMP plan? YES NO*
     Monitoring the facility? YES NO*
     Recording monitoring results? YES NO*
* If no, go to worksheet #1 table, below

 

Worksheet #1 Table

Name of Person(s) responsible BMP Plan Implementing Monitoring record keeping
         
         
         
         

This worksheet was developed by the Arizona Department of Agriculture, Agricultural Consultation and Training Program, in collaboration with Natural Resources Conservation Service, University of Arizona, &AZ Conservation Districts, for use in record keeping requirements for the Arizona NPDES General Permit.

Page updated 7/02.


Acronyms and selected definitions


© 2000 The University of Arizona. All contents copyrighted. All rights reserved. http://ag.arizona.edu/animalwaste/
Cooperative Extension button Local Natural Resource Conservation Districts button Arizona
NRCDs

Arizona
Dept. of
Agriculture

AZ Dept. Environ.
Quality
Natural Resources Conservation Service button